1)COP KOMPETEN LESEN
UPGRADE 3FASA &
APPLY METER ASING
3FASA
2)TUKAR MCCB 150
150A TPN
35kA
480/500v
3)LAY CABLE DARI DB KE
PANEL BOARD METER
BARU SEPANJANG
30METER RED YELLOW
BLUE AND NUETRAL
SAIZ CABLE 25MM DAN
LAY TRUNKING 2X2
4)LAY CABLE 2POLE
AMORED 10MM
SEPANJANG 80METER
UTK KEDAI
BESI PENUTUP CABLE
5)BESI BREAKAT IKAT
TRUNKING
6) UNBALANCED RED
FASA 40M YELLOW FASA
25M FASA BLUE
FASA35m
7) EARTHING TESTER
8)LAY CABLE 16MM
5BTG COOPER ROAD
9)METER BOARD METER
UTK METER ASING
3FASA
10)METER BOARD 3FASA
DENGAN BASBAR
TERMINAL UTK
UPGRADE KW
11)KERJA2 PENDAWAIAN
SEMENTARA UTK APPLY
METER TNB ASING
UPGRADE 3FASA &
APPLY METER ASING
3FASA
2)TUKAR MCCB 150
150A TPN
35kA
480/500v
3)LAY CABLE DARI DB KE
PANEL BOARD METER
BARU SEPANJANG
30METER RED YELLOW
BLUE AND NUETRAL
SAIZ CABLE 25MM DAN
LAY TRUNKING 2X2
4)LAY CABLE 2POLE
AMORED 10MM
SEPANJANG 80METER
UTK KEDAI
BESI PENUTUP CABLE
5)BESI BREAKAT IKAT
TRUNKING
6) UNBALANCED RED
FASA 40M YELLOW FASA
25M FASA BLUE
FASA35m
7) EARTHING TESTER
8)LAY CABLE 16MM
5BTG COOPER ROAD
9)METER BOARD METER
UTK METER ASING
3FASA
10)METER BOARD 3FASA
DENGAN BASBAR
TERMINAL UTK
UPGRADE KW
11)KERJA2 PENDAWAIAN
SEMENTARA UTK APPLY
METER TNB ASING
+++++++++++++++++++++++++++++++++++++
kerja2 menaik taraf 1 fasa wiring kepada 3 fasa untuk wiring rumah. tukar kotak DB 3 Fasa, wayar submain 16mm x4, Papan meter 3 Fasa dan lain2
Dan naik taraf pendawaian bumi, wayar 10mm
Lokasi : Kg ulu klawang